Project breakdown:

  • All waste and work compliant with LEED
  • Termination of existing services
  • Installation of temporary welfare
  • Installation of temporary lighting
  • Installation of temporary water
  • Installation of temporary site power
  • Complete strip out back to shell
  • Strip out of toilet areas
  • Strip out of kitchens
  • Strip out of store rooms / racking
  • Strip out of all Mechanical + Electrical
  • Removal of furniture
  • Removal of ceilings
  • Removal of plasterboard partition walls
  • Removal of floor coverings
  • Removal of wall & floor tiles
  • Removal of ducting
  • Removal of window finishes
  • Removal of raised flooring
  • Removal of all waste on Titan wait&Loads
  • Removal of stairs structure to basement level
  • Removal of plant room equipment
  • Installation of temporary stairs by Titan
  • Installation of scaffold crash decks by Titan
  • Segregation of all waste in to Titan wheelie bins

Titan Demolition Ltd to have 1 man on site at all times after our completion to segregate all waste from other trades in to the appropriate bins for disposal.

Contract Length – 3 weeks