Strip Out, Tommy Hilfiger, London

Project: Tommy Hilfiger, Regent Street, London
Client: Schwitzke
Project Type: Strip Out
Works Duration: 8 weeks

Project breakdown:

  • All waste and work compliant with LEED
  • Termination of existing services
  • Installation of temporary welfare
  • Installation of temporary lighting
  • Installation of temporary water
  • Installation of temporary site power
  • Complete strip out back to shell
  • Strip out of toilet areas
  • Strip out of kitchens
  • Strip out of store rooms / racking
  • Strip out of all Mechanical + Electrical
  • Removal of furniture
  • Removal of ceilings
  • Removal of plasterboard partition walls
  • Removal of floor coverings
  • Removal of wall & floor tiles
  • Removal of ducting
  • Removal of window finishes
  • Removal of raised flooring
  • Removal of all waste on Titan wait&Loads
  • Removal of stairs structure to basement level
  • Removal of plant room equipment
  • Installation of temporary stairs by Titan
  • Installation of scaffold crash decks by Titan
  • Installation of new steel work by Titan
  • Segregation of all waste in to Titan wheelie bins

Titan Demolition Ltd to have 1 man on site at all times after our completion to segregate all waste from other trades in to the appropriate bins for disposal.

View the waste report here

Do you have a similar project? Call Titan Demolition Ltd today on 0808 146 9212 or use our enquiry form and let’s get things started.