The Stafford London

16-18 St James’s Place
London
SW1A 1NJ

Project breakdown:

  • Strip out of the hotel bedroom areas
  • Strip out of the hotel bedroom suite
  • Strip out of toilet areas
  • Strip out of kitchens
  • Strip out of all Mechanical + Electrical
  • Removal of furniture
  • Removal of ceilings
  • Removal of plasterboard partition walls
  • Removal of floor coverings
  • Removal of wall & floor tiles
  • Removal of ducting
  • Removal of all waste on Titan wait&Loads

Contract Length – 4 weeks