The Stafford London
16-18 St James’s Place
London
SW1A 1NJ
Project breakdown:
- Strip out of the hotel bedroom areas
- Strip out of the hotel bedroom suite
- Strip out of toilet areas
- Strip out of kitchens
- Strip out of all Mechanical + Electrical
- Removal of furniture
- Removal of ceilings
- Removal of plasterboard partition walls
- Removal of floor coverings
- Removal of wall & floor tiles
- Removal of ducting
- Removal of all waste on Titan wait&Loads
Contract Length – 4 weeks
View the waste report here