Strip out and demolition at Walton Snooker Centre

Walton Snooker Centre
Genesis House
143 Molesey Avenue
West Molesey KT8 2RY

Project breakdown:

  • Strip out of entire building
  • Strip out of all toilet areas
  • Strip out of kitchens
  • Strip out of all Mechanical + Electrical
  • Demolition of side building
  • Demolition of rear building
  • Demolition of concrete stairs
  • Demolition off all internal brick / block walls
  • Demolition of all external brick / block walls
  • Diamond saw cuts to form openings
  • Diamond saw cuts to beams for removal
  • Removal of all asbestos & hazardous wastes
  • Removal of portal frame roof structure
  • Removal of lift
  • Removal of furniture
  • Removal of ceilings
  • Removal of plasterboard partition walls
  • Removal of floor coverings
  • Removal of wall & floor tiles
  • Removal of ducting
  • Removal of waste on Titan Roll on Roll off skips
  • Removal of all waste on Titan wait&Loads
  • Chasing in floor and walls for new services

Contract Length – 8 weeks