Strip Out, Brompton Road, London

Project breakdown:

We have undertaken major works on Brompton Road London, situated next to the famous Harrods Department Store! it covered the strip out and demolition works in the Highstreet shops on Brompton Road and the above flats and offices.

We’ve undertaken works in:
37 shop
37 flat
43-49 offices
53-57 offices
55 shop
61 shop

Titan Demolition are carrying out the works for Park Refurbishment Limited, We have worked closely with this company before, so we was pleased when they asked us to work with them again on this large project!

The major works carried out by ourselves are listed below:

  • Full strip out
  • Removal of partitioning / stud walls
  • Removal of doors and frames
  • Removal of ceilings (double ceilings)
  • Removal of all lighting
  • Removal of all data facilities and cabling
  • Removal of all plumbing and drainage
  • Removal of all M+E / services
  • Removal of all tiled floor finishes and carpets
  • Removal of all raised access flooring
  • Removal of all fixtures and fittings
  • Removal of all kitchens and bathrooms to be stripped and removed
  • Removal of all soft wood and skirting
  • Removal of all benching
  • Removal of all wall cupboards
  • Removal of all shelving and sink units
  • Removal of all blinds
  • Removal of kitchen
  • Removal of toilets
  • Removal of all mirrors
  • Removal of blockwork and masonry walls
  • Removal of shop furniture

The works here at Brompton Road have been continuous, steady and consistent for the last few months. Our works are due to be completed in the coming weeks, and we look forward to seeing the end result. Once again we have worked closely with Park Refurbishment Limited to insure that all works are carried out to the popular Titan high standard, professionally, and of course on time!

“I am writing to confirm that Park Refurbishment are currently engaged with Titan Demolition on several projects at several premises on Brompton Road, on behalf of a Major Property Investor Client engaging them at the Strip-out phases of retail & office remodelling projects.

As Principal Contractor, we contracted Titan Demolition to carry out a full Strip-out of all previous Tenant’s F&Fs layer upon layer and then take us back to the fabric of the original Victorian Shell, ready for further Structural Demolition.

This is the 2nd Phase of works with Titan, the first project was completed in June 2015, and I have the following feedback:

  1. The 5no. Stripout Packages are on course to being achieved on-time to a challenging deadline at this challenging location and completed within the Cost/Quotation provided.
  2. The management of the project inc. Health & Safety; Personnel; traffic movement; waste removal and dust control were all carried out to a consistently high standard.
  3. As the Contracts Manager, I found communication with all staff including Joe Gray was easy and effective. The Site Managemnet has been done in a calm and disciplined manner.
  4. The Estate Management Team and our Client continue to be impressed and complimentary about the work done and the manner it is being done.

In summary, I would not hesitate to recommend Titan Demolition to carry out such works for any potential client and Park Refurbishment Ltd will certainly be please to offer Titan Demolition the opportunity to carry out any similar projects going forward, over and above previous companies we have used in the same field.”

Andrew Rycroft, Director www.parkrefurbishment.co.uk