Demolition, Muswell Hill, London

Project: 54 – 60 Sutton Road, Muswell Hill, London N10 1HG
Client: Matt Finished Ltd
Project Type: Demolition
Works Duration: 5 weeks

Project breakdown:

  • Project Management.
  • Logistics Management.
  • HS&E Management.
  • Enabling works.
  • 210 Hitachi 360 Excavator.
  • R400X Crusher.
  • Isolation and Draining of services.
  • Scaffolding for property protection.
  • Strip out of structures.
  • Demolition of Sutton road garage & 15nr garages.
  • Removal of 4nr redundant foam filled fuel tanks.
  • Demolition of a neighbouring residential 4-bedroom property.
  • Removal of non-notifiable and notifiable asbestos.
  • Demolition of ground slab and foundations to a depth of 2 metres.
  • Reduced dig to an average depth of 1.3 Metres.
  • Supply and Install of an 875mm 900sqm piling mat to match the piling specification.
  • Crushing of all hardcore and concrete to type 1 spec.
  • Saw cutting to retain party wall.
  • Supply and installation of temporary props to party wall.
  • Removal of all associated waste.