Demolition and Façade Retention 2-10 Cobb street


Project:
Demolition and Façade Retention
Client: Alexander Maltby
Location: 2-10 Cobb street, London
Works Duration: 32 weeks
Works period: 2018

Titan Demolition carried out the full soft strip and demolition at 2-10 Cobb street. The job was a great success to us and Alexander Maltby with no issues on site. The temporary works at 2-10 Cobb street has been designed, installed and maintained throughout the whole job by Titan Demolition with no faults or issues. All waste on site was removed in a safe manner and segregated in to its waste categories and removed for recycling works also included slab and footing removal and waste and arising removed from site.
Titan Demolition played a Contractor role for this project. Managing all:

  • Strip out
  • Temporary works maintenance
  • Waste removal
  • Demolition
  • Temporary works design
  • Temporary works installation
  • Installation of propping
  • Waste segregation
  • Site management
  • HSE Management
  • Temporary works maintenance
  • Waste removal
  • Day to Day issues
  • Liaising with the council
  • Liaising with Alexander Maltby team daily
  • Waste management

Do you have a similar project? Call Titan Demolition Ltd today on 0808 146 9212 or use our enquiry form and let’s get things started.