Demolition and Façade Retention 2-10 Cobb street
Project:Demolition and Façade Retention
Client: Alexander Maltby
Location: 2-10 Cobb street, London
Works Duration: 32 weeks
Works period: 2018
Titan Demolition carried out the full soft strip and demolition at 2-10 Cobb street. The job was a great success to us and Alexander Maltby with no issues on site. The temporary works at 2-10 Cobb street has been designed, installed and maintained throughout the whole job by Titan Demolition with no faults or issues. All waste on site was removed in a safe manner and segregated in to its waste categories and removed for recycling works also included slab and footing removal and waste and arising removed from site.
Titan Demolition played a Contractor role for this project. Managing all:
- Strip out
- Temporary works maintenance
- Waste removal
- Demolition
- Temporary works design
- Temporary works installation
- Installation of propping
- Waste segregation
- Site management
- HSE Management
- Temporary works maintenance
- Waste removal
- Day to Day issues
- Liaising with the council
- Liaising with Alexander Maltby team daily
- Waste management