Project: Beals Shopping Centre, Winchester
Client: Commercial Refurbishment Solutions Ltd.
Project Type: Strip Out
Works Duration: 6 weeks
Project breakdown:
- Strip out of toilet areas
- Strip out of kitchens
- Strip out of all Mechanical + Electrical
- Removal of furniture
- Removal of ceilings
- Removal of plasterboard partition walls
- Removal of floor coverings
- Removal of wall & floor tiles
- Removal of air handling equipment
- Removal of all waste on Titan wait&Loads
- Removal of all waste on roll on/roll off skips
- Removal of mechanical plant
- Removal of shop front
- Removal of canteen area
- Removal of windows
Contract Length – 8 weeks